I have been fighting myself on the topic of the GITI v1 to v2 migration for far too long now. I have three weeks in which I don’t have to do anything, and I think it is time for me to dedicate some time to finalizing the transistion and letting v1 go to rest permenantly (minus the administration functions, which will serve for v2 in the interim). I have been dragging out the conversion for way too long. I dont need to have v2 complete, I just have to get all of the modules assebled and as functional as they were in v1. So far I need to finish out education and schedule, then convert todo, notepad and email. Once those critical pieces are finalized, everything should be a go for packaging up GITI v1 permenantly.