I’m starting to think that GITI is going to get a new module, “List”, a hybrid of v2_todo, notepad and just a general linked tree structure for storing information that isn’t very long.
This evening I realized that GITI’s v2_To Do module isn’t really used at all and isn’t really practice. The v2_ToDo module doesn’t even use due dates. I am planning to bring the old Todo code back from the dead, as well as its old database table and work to make the code better than it was and maybe change the table structure to make it more usable. The module used to be useful in GITI v1, even though it was kind of privative, but at least I used it.